![]() |
|||
|
Home(less) for the Holidays PROBLEM: |
|||
|
|
SOLUTION: Custom-designed switchgear made to retrofit perfectly The electrical contractor, one of the largest in Philadelphia, called on Penn Panel & Box Company because of Penn Panels ability to create innovative designs for unique situations. Penn Panel quickly designed and manufactured the replacement components to fit into the existing location. In order to solve the problem of the difficult access, Penn Panel & Box Company manufactured the assembly so that it could be split in half from front to rear to fit through the doorways and around the corners. The new switchgear was reassembled inside the building as it was being installed. Penn Panel completed all design and fabrication in a timely manner so that the new switchgear was in place for the cold weather season. The operators of Shelter House can rest easy knowing that the residents will be warm during the holidays and safe from any problems with the electrical switchgear.
|
||
|
| Home | Corporate History | Products & Services | Emergency Service | Office Locations | Site Map | ©
1999 Penn Panel & Box Company |
|||